CONTINGENCY PLAN OR
MITIGATION PLAN OR BACK-UP PLAN
To
overcome the risks, a contingency plan has to be made. At least to reduce the
percentage from 100% to 20%
Let
us consider an example for 5, 6,7
In
the project, the assumption we have
made is that all the 3 test engineers will be there till the completion of the
project and each are assigned modules A, B, C respectively. The risk is one of the engineers may leave
the project mid-way. Thus, the mitigation
plan would be to allocate a primary and secondary owner to each feature.
Thus, one engineer quits – the secondary owner takes over that particular
feature and helps the new engineer to understand their respective modules.
Always assumptions, risks, mitigation
plan are specific to the project.
The
different types of risks involved are,
Ø Resource point of
view
Ø Technical point of
view
Ø Customer point of
view